CAPABILITIES

Where permeable concrete earns its place.

Hydrax Infrastructure designs, supplies and places permeable concrete across residential, commercial, civil and arboricultural work. Nine things we do, and the specification behind them.

WHAT WE DO

Nine places the storm stops being your problem.

Commercial

Car parks

The bays, aisles and overflow areas that make up most of your impervious area. Treating the storm where it lands is usually cheaper than piping it to a tank in the low corner.

Domestic

Driveways

Crossovers, driveways and hardstand on a single allotment. The usual trigger is a stormwater condition on a knock-down rebuild, and a 100 mm surface on a drained base clears it.

Civil

Footpaths and streetscapes

Paths, verges, plaza paving and shared zones. A permeable surface keeps water in the root zone of the street trees instead of sending it straight to the kerb.

Arboricultural

Tree Protection Zones

Paving inside a TPZ under AS 4970, built no-dig so the structural root zone is never excavated or compacted. We work to the radius the arborist nominates, not around it.

Commercial & Domestic

Sports courts and surrounds

Courts, run-offs and spectator areas that have to drain fast and be usable straight after a storm. No crossfall to a pit, and no puddle sitting on the baseline.

Industrial

Civil infrastructure

Access lanes, depot hardstand, maintenance aprons and the drainage reserve around them. Designed to the traffic and the catchment, not picked out of a catalogue.

Industrial

Aprons and hardstand

Large, flat, heavily conditioned areas where surface water has nowhere useful to go. The storage lives in the base, under pavement the site already needed.

Domestic & Commercial

Excavation and sub-base

Bulk excavation, subgrade preparation and the washed open-graded base that does the actual storing. Get this layer wrong and the surface above it cannot save you.

Professional

Placement and finishing

Supply, placement, compaction and curing by crews who pour permeable every week. The narrow window on water content and curing is where most failures start.

THE SPECIFICATION

The numbers your consultant will ask for.

Typical design ranges
PropertyTypical rangeNotes
Surface thickness100 to 150 mmSet by the traffic the pavement has to carry
Void content, surface15 to 25%By volume, through the full depth of the layer
Infiltration, new surface2 to 5 L/s/m²Drops over time with sediment, restored by sweeping
Wearing surface strength25 MPa and aboveSupplied and tested to AS 1379
Surface aggregate7 to 10 mmSingle sized, to AS 2758.1
Sub-base depth150 to 300 mmSet by the storage the catchment has to hold
Sub-base aggregate20 mm washedOpen graded, roughly 30 to 40% voids
SubgradeIn situLeft uncompacted where infiltrating, lined and drained on reactive clay

These are the ranges a permeable concrete pavement usually lands in. They are not a specification for your site. The real build comes out of the geotechnical report, the traffic, and the volume your catchment has to hold, which is exactly what a spec review produces.

HOW A JOB RUNS

Four steps, and you can stop after the first.

Spec review

Thirty minutes with an engineer. Bring the drainage plan, the geotechnical report if you have one, and the council condition you are trying to clear. If permeable is the wrong answer for your site, this is where we say so.

Design and modelling

We hand your civil consultant the infiltration rate, void ratio and layer build to drop into a MUSIC node against the State Planning Policy objectives, plus the drainage detail your council checks against the FNQROC Design Manual.

Build

Excavation, subgrade preparation, the washed open-graded base, then the pour. Placement, compaction and curing by a crew that places permeable every week.

Handover

Infiltration tested on the finished surface, and a maintenance schedule the owner can actually follow. Sweeping intervals, not a lecture.

THE NEXT STEP

Send us the site. We'll talk drainage.

Bring the drainage plan, the geotechnical report if you have one, and the number your council reviewer flagged. Thirty minutes with an engineer, not a sales call.